ΑSKIO II (37.80MW)
Year: 2022-2023
Client: IBERDROLA SA
Airenergy: Construction
Project Info:
- 9 WTGs Vestas V-150 4.2MW
- 10 km internal network
- 17,7 km of interconnection line
- 139.000 m3 excavations
- 81.000 m3 embankments






ΑSKIO II (37.80MW)
Year: 2022-2023
Client: IBERDROLA SA
Airenergy: Construction
Project Info:
- 9 WTGs Vestas V-150 4.2MW
- 10 km internal network
- 17,7 km of interconnection line
- 139.000 m3 excavations
- 81.000 m3 embankments